电力工程英文简历范文_英文版的电力工程简历范文
英文版个人简历是电力工程外企个人求职者连接招聘方的桥梁。以下是小编要与大家分享的电力工程英文简历范文,供大家参考!
电力工程英文简历范文(一)
Self-appraisal/Career Objectives
Self-appraisal:
teh vocation of electronic technology
Job Target
Current Industry: Electronics·Micro-electronics
Current Job Category: Sales
Working Experience: 3 year(s)
Current Position Level: Mid Career(2+ years experience)Current Salary: monthly salary RMB 1800 pre-tax
Desired Salary: Negotiable
Target Industry: Medical Equipment, Internet·e-Commerce, Instrument·Industry Automation·Electicity, IT service·system integration, Energy·Water Conservancy
Target Job Category: Customer Service Specialist·Assistant, Customer Service Manager·Supervisor, FAE( Field Application Engineer) Manager·Supervisor, Sales Representative·Account Manager·Account Representative·Sales associate, Technical Support·Maintenance Manager
Desired Job Type: Full Time
Target Location: Any
Start Working: within 1 week
Working Experience
jasay Company Profile
Company Profile: ON Semiconductor (Nasdaq: ONNN) is a leading global supplier of advanced semiconductors for power and data management applications. The company's innovative products drive the designs for increasingly sophisticated communications gear, computing plaON Semiconductor is a leading global supplier of advanced semiconductors for power and data management applications.
Type of Company: State-owned Company
Size of Company: 1 - 49
E-mail:xx
Mobile: 13888888888
Web Page:
Date of Birth: 1980/05
Nationality: China
HuKou: Guangxi
Political Background: League member
2003/08 - 2006/08
engineerLocation: sale-after service center
Responsibilities & Achievements:
the developing of PIC and C51 sigel chip.
I was in change of debugging for The communications system of speedway, the system of charge.the monitoring system.
Writing The tender document and The construction scheme for the system of speedway.
Education
1999/09 - 2003/07 guangxi university of technlogy
controlling and measurment technlogy Electronic Information Science Bachelor
Guanxi University of Technology (GUT), founded in 1956, is situated in theworld-famous scenic city of Guilin. The campus lies north of the Qixing (Seven-star) Park, the Li River meandering to the west. With an elegant environment featuring lush green trees, quiet and peaceful, the university is an ideal place for academic study and research.
Language
English: Fluent Cantonese: Mother tongue Southern Fujian Dialect: Average
Grade of English: Not PassedOral English: Fluent
电力工程英文简历范文(二)
The basic information
Name: XXX.
Gender: male
Ethnic composition: the han nationality
Date of birth: 01, 1983
Height: 176
Marital status: married
Title: primary electrical assistant engineer
objective
Intention job: power electrical engineer, technician
Expected monthly salary: 4000-5000 yuan
Education experience
School: university of XXX
Graduation time: June 2004
Professional name: electrical technology
Highest degree: bachelor
Computer level: proficiency in typing speed: 60 words per minute
Work experience
On June 6, 2004 - September 2005 XXX co., LTD., an electrical engineer
Responsible for electrical equipment management, electrician class staff skill training, the new, maintenance and technical renovation work, electrical accessories material management, departments and other units of electricity contact coordination work.
Main results:
1, a production line equipment capacity of modification.
2, new roads (720 meters) across the street lamp installation.
3, steam metering equipment installation and debugging (electrical, thermal control).
4, driving change PLC control work.
Five quarters, office air conditioning installation material budget work (230 air conditioners).
In October 2005 - July 2008 XXX co., LTD. (state-owned enterprise) electrical equipment management
Work in the management of high voltage electrical equipment insulation, including the preventive test electrical equipment (electrical test, antifouling flash, overvoltage) account management, power plant, water and desulfurization system of electrical equipment maintenance.
The main experience:
1, participate in such and such power plant 2 * 600 mw unit construction work.
2, participate in the 500 kv / 720 mva transformer factory acceptance work.
3, independent 3 sets of 20 kv / 35 kva factory acceptance work.
4, participate in the 600 mw generator factory dynamic balance test acceptance work.
In August 2008 - XXX co., LTD. Electrical supervisor so far
Mainly responsible for:
1, grinding workshop construction installation debugging.
2, the infrastructure of motor maintenance room installation debugging.
3, electrical non-standard phenomena of the rectification work and troubleshooting work.
Self assessment
I character cheerful, can bear certain work pressure, external communication and coordination ability is strong, familiar with power supply and distribution system reform work processes, such as their capacities are confident to do well in every thing in your life and work!
contact
Mobile phone number: 13888888888
E-mail: www.xx.com
电力工程英文简历范文(三)
personal information
name: liu sir
gender: male
birth date: sep. 1976
birth place: shao yang hunan
university: harbin institute of technology
degree: bachelor
contact: 0
education background
undergraduate 4-year degree in electrification engineer dept.
the courses including: advanced maths, college english,
engineering chart, electric circuit theory, electron technology,
motor-driven etc. have a good command of the theory of design of motor,
manufacture-art, electromotive-control.
took part in the national college student electron – design competitionworking experience
jul. 2014—present midea holding co., ltd (welling branch )
worked as project engineer & technology support engineer
familiar with ac motor structure and elements, have the working experience in electronics, design dc motor according to the customer’s request and make
confirmation sample motor, cooperate with sale engineer to negotiate with customer. experience in dealing with gree, le hua, zhi gao etc.
about motor of air- conditioner.
in charge of the business of haier and hisense : solving problem on spot,
customer service, follow up the sample motor and solve sample quality problem.
coordinate with various parties internally and externally including the
customer communication and production line.
familiar with the quality of product over their complete life cycle from the design,
manufacturing to service.
additional activities
took part in studying the iso9000 and qs9000, learn how to control the quality and take the action to achieve zero defect performance based on continuous
improvement. the key elements for continuous improvements are customer satisfaction, defect prevent and elimination, and process control.
individual specialty
good technical knowledge and management skill to lead engineering team, analytic minded and high initiative, able to work in an evolving and high pressure and work
independently. good written english, good communication skill and interface with customers on all technical aspects. familiar with operating the computer.
objective
search good position and a good company which can provide the personal
development space.
电力工程英文简历范文_英文版的电力工程简历范文的评论条评论